Foreclock. Always prepared.
Building equipment deadline intelligence

Every building has hidden expiration dates.

Foreclock inventories your critical building systems, finds the deadlines hidden inside them, prices each one and tracks every fix through to verified completion.

BUILDING CONTROLS2038 date limit: review ELEVATOR PHONECopper line dependency ACCESS CONTROLSoftware support ending FIRE ALARM PANELSupport discontinued ELEVATION / MAIN CAMPUS / CRITICAL SYSTEMS
Illustrative drawing.
We do the first inventoryNo spreadsheet needed to start
Every finding sourcedConfirmed or flagged for review
Tracked to verified fixFound, budgeted, fixed, verified
IndependentWe do not sell equipment or take commissions
01 / The problem

Equipment that looks fine can still be running out of time.

Most building condition assessments are visual. They catch wear and damage, not the deadlines hidden inside equipment that still works perfectly.

TYPE A

Copper phone lines are being retired

Elevator emergency phones, fire alarm dialers and security panels that rely on copper lines can go silent when the line is cut, often with no warning on site.

TYPE B

Manufacturer support ends

Fire panels, access control and building controllers lose software updates and replacement parts on dates set by their makers, years before the equipment wears out.

TYPE C

Built-in date limits are coming

Some older equipment software cannot count past certain dates in 2036 and 2038. Affected devices may misread the date, reject certificates or fail scheduled tasks.

02 / The calendar

The deadlines are already set. The only question is whether you see them in time.

Now

Copper retirements

Carriers are retiring copper phone lines area by area. Life-safety devices that dial out are exposed.

Every year

End-of-support notices

Manufacturers announce end-of-support and end-of-parts dates for panels and controllers.

Feb 7, 2036

Network time rollover

Older devices that set their clocks from network time may jump to the wrong date.

Jan 19, 2038

32-bit date limit

Devices that count time in a signed 32-bit number run out of dates and can fail.

03 / Process

From first walk-through to verified fix, every step is tracked.

Most institutions do not have a clean list of their critical equipment. So we build it with you, then track every finding until it is closed.

STEP 01

Inventory

We build your system list from your records, contractor service reports and photos of equipment nameplates.

Foreclock
STEP 02

Check deadlines

Each system is checked against copper retirements, manufacturer support dates, known date limits and inspection certificate dates.

Foreclock
STEP 03

Prioritize and price

Every finding receives a risk level, a due date, a cost estimate and the source behind it.

Foreclock
STEP 04

Budget and plan

Costs feed your capital plan by year. We help write the replacement scope.

Your team
STEP 05

Fix

Your contractors, or a licensed partner we introduce, do the work. We help you compare bids.

Your contractors
STEP 06

Verify and watch

Your team uploads the invoice or a photo. An analyst confirms the fix, and we keep watching for the next deadline.

Foreclock

You do not need a spreadsheet to start. In your first assessment we build the inventory for you. After that, your team keeps it current in the platform and we keep watching.

How we find everything

We use every source you already have. An analyst verifies every result.

01

Photo of the label

Staff photograph equipment nameplates with a phone. We record the maker, model, serial number and date from each photo.

02

Your existing paperwork

Inspection reports, service contracts and invoices name equipment your team may have forgotten. We capture every system they mention.

03

Phone bills

We match the copper lines on carrier bills to the elevators, alarm panels and call boxes they serve.

04

Network scan

With approval from your information technology team, a read-only scan identifies connected building controllers and their software versions.

05

Public records

Permit and elevator registration records show what each building should have, so missing items stand out.

04 / Platform

One place for facilities, risk and finance to see what is coming.

What your team sees, and what our analysts work in behind the scenes.

Foreclock portfolio dashboard showing systems tracked, open findings, deadlines by year and buildings, with sample data Foreclock system record for a fire alarm control panel with nameplate photo, matched deadlines and analyst review, with sample data Foreclock fix tracker board with findings moving from found to verified, with sample data

Portfolio dashboard. Every building, every deadline and the total cost to fix, in one view for facilities, finance and leadership.

System record. Behind every finding: the nameplate photo, equipment details, the deadlines it matched, the source for each one and an analyst sign-off.

Fix tracker. Each finding moves from found to budgeted, contractor selected, fixed and verified, with an owner and a due date.

Product screens with illustrative sample data. Not a real customer.
05 / How we work

Start with an assessment. Stay ahead with the platform.

Start here

Building assessment

A fixed-scope, fixed-price engagement for one building or an entire campus.

  • We build your first inventory
  • Deadline check on every critical system
  • Priced, prioritized report
  • Briefing for leadership and finance
Ongoing

Platform subscription

Your inventory, deadlines and fixes in one place.

  • Alerts before every deadline and certificate expiration
  • Inspection certificates and permits in one place
  • Fix tracking to verified completion
  • Board reports and costs by year for capital planning
  • Records you can share with lenders, insurers and auditors
Optional

Hands-off service

For owners who want us to handle the walk-throughs.

  • Periodic site visits with partner firms
  • Inventory kept current for you
  • Help comparing contractor bids
  • No equipment sales or commissions
06 / Who we serve

Built for institutions that cannot afford surprises.

Hospitals and clinicsNurse call, fire and life safety, building systems
Colleges and schoolsCampus emergency phones, fire alarms, door access
Senior living communitiesEmergency call systems and resident safety
Offices and commercial buildingsBuilding controls, elevators, access control
Airports and transitElevator and escalator phones, emergency call boxes, access control
Government and public buildingsCourthouses, libraries, public safety and housing
Banks and credit unionsBranch alarms, vault and access systems, support dates
Lenders and insurersEquipment deadlines that fall within a loan or policy term
Data centers and laboratoriesCooling, controls, timing and monitoring equipment
Book an assessment

Find out what is expiring in your buildings before it becomes an emergency.

Tell us about your buildings. We will reply within two business days with a scope, a timeline and a fixed price.

Request an assessment